AGP Picks
View all

Orlando Hotels Without EV Chargers Risk Losing Guests to Nearby Properties

News originally published by

GlobeNewswire

  • Eighty percent of U.S. EV drivers say they would travel farther for EV-friendly lodging.¹
  • Wallace Energy installs and operates guest EV charging for Orlando hotels and resorts under one contract, from site evaluation through guest billing and 24/7 driver support.

Key Largo, FL, Nov. 16, 2026 (GLOBE NEWSWIRE) -- Nine in 10 U.S. EV drivers are more likely to stay at a hotel that offers EV charging, according to an April 2025 survey commissioned by the Boutique and Luxury Lodging Association.¹ For hotels and resorts in Orlando and the Kissimmee and Lake Buena Vista corridor, Wallace Energy installs that charging and runs it after launch. The company is a turnkey developer of commercial EV charging in Florida and an engineering, procurement, and construction (EPC) provider licensed in more than 40 states. Ownership chooses where the chargers go and what guests pay.

“EV drivers plan their stay around where they can charge overnight. When a hotel has no chargers, those guests book the property down the street that does,” said Bobby Wallace, Chief Executive Officer of Wallace Energy. 

Why EV Drivers Book Hotels With Chargers

The same survey found that almost three in four EV drivers would pay a higher room rate for the amenity.¹

Public charging has not kept pace with the cars on the road. Florida had about 450,400 registered light-duty all-electric vehicles in 2025 and 15,444 public charging ports as of November 2026, according to the U.S. Department of Energy’s Alternative Fuels Data Center.²

For an Orlando hotel, the cost of not having chargers shows up at booking. A guest who cannot charge at the hotel will charge at a nearby station and may not book there next time.

Installing New EV Chargers at Orlando Hotels and Resorts

Before a guest can plug in, a hotel’s first charger needs building and electrical permits and a utility service application. Construction then calls for a licensed electrical crew. At many Central Florida properties, the engineering staff or the general manager end up coordinating that work.

Wallace Energy begins with a site evaluation that counts parking spaces and measures how long guests and visitors stay parked. The evaluation also checks whether the existing electrical service can carry the planned ports. Every phase after that runs under one Wallace Energy contract:

Phase Scope
1. Site evaluation Parking count, how long guests and visitors park, electrical service assessment, charger placement plan
2. Engineering Electrical and civil drawings for the specific property
3. Permitting Local building and electrical permits, filed and tracked to issuance
4. Utility coordination Service application, make-ready scope, energization schedule
5. Construction Trenching, conduit, panel work, charger installation, commissioning
6. Software activation Guest, owner, staff and public rates, payments, roaming, and reporting configured in Horizon
7. Driver and site support 24/7 toll-free support line for drivers and site hosts, remote diagnostics, field service dispatch
8. Long-term operations Billing and ongoing maintenance


EV Charger Guest Billing and Driver Support for Orlando Hotels

At resorts along International Drive and in the Kissimmee and Lake Buena Vista corridor, many guests plug in when they arrive and charge overnight. A driver whose session will not start calls Wallace Energy’s 24/7 toll-free support line. Horizon runs remote diagnostics on the charger before a technician is dispatched. Guests pay by tap or through the app, and those payments run through the charger management platform, outside the hotel’s point-of-sale system.

Setting Guest, Owner and Public Charging Rates at Orlando Resorts

Ownership approves where the chargers go, whether that follows valet, self-park or a garage the property already runs, and sets the rates drivers pay. Horizon places each driver in a user group with its own rate. A hotel can offer registered guests one price while public drivers pay another. A timeshare or vacation ownership resort can price owners, nightly guests and staff vehicles separately on the same ports. Rates can change after launch without new equipment. A general manager or controller reviewing the first season can see how the chargers were used before approving more ports.

“Charging can become a revenue line for a hotel, and it gives EV drivers one more reason to book. None of that should mean another task for the staff,” Wallace said.

Frequently Asked Questions

Question: Can EV charging be ready when a new Orlando hotel opens?

Answer: Yes, when charging is planned during design rather than after construction. Wallace Energy sets the make-ready scope and submits the utility service application while the building is still on paper, so conduit, panel capacity and energization move with the hotel’s construction schedule. That keeps the chargers from becoming the last open item before opening day.

Question: Can an Orlando hotel add EV chargers without upgrading its electrical service?

Answer: Often it can, depending on what the site evaluation finds. Horizon’s dynamic load management shares the available power across ports, so several guest vehicles plugged in overnight can charge without every port drawing full power at once. If the existing service cannot carry the planned ports, the evaluation shows that before any work is priced, and the upgrade is scoped into the project from the start.

Question: How long does EV charger installation take at an Orlando or Kissimmee hotel?

Answer: The local building department and the utility control most of the timeline. Permits move on the building department’s schedule, and the energization date moves on the utility’s, which often decides when the chargers go live. Wallace Energy handles the follow-up with both offices, so the hotel’s point of contact is not chasing permit or energization dates ahead of a busy travel season.

Question: How does an Orlando hotel track revenue from its EV chargers?

Answer: Horizon’s dashboards show revenue, energy consumption, utilization and charger status in real time for each property. The hotel sets its own guest and public rates and can change them without new equipment.

Question: How does EV charging work across several Central Florida properties in one hotel group?

Answer: Wallace Energy evaluates, permits and connects each property on its own, because permits and utility applications are specific to each site and utility territory. Horizon then manages rates, payments and real-time dashboards across every site, so a group can set rates by property and compare revenue and utilization in one place.

Hotels, resorts and vacation ownership properties in the Orlando area can request a no-cost analysis through Wallace Energy’s EV charging stations page.

Sources:

  1. Boutique and Luxury Lodging Association, “Sponsored Survey Quantifies Importance of Charging Amenity for Boutique Hotels,” April 16, 2025 
  2. U.S. Department of Energy, Alternative Fuels Data Center, Florida Transportation Data, 2025 registrations and current public charging ports

About Wallace Energy

Wallace Energy is a turnkey commercial solar and EV charging developer founded in 2020. We manage site evaluation, engineering, permitting, utility coordination, construction, software, and long-term operations under one roof, giving property owners a single accountable partner for energy infrastructure projects. Our leadership team has collectively delivered more than 8,000 solar projects nationwide, and our in-house EV charging software provides transparent access to charger performance, driver data, revenue, and site operations. Wallace Energy makes energy infrastructure simple, competitive, and built for long-term value.


Ujala Qazi
Zen Media
pr@zenmedia.com

Primary Logo

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Share this page:

Advanced Search Options

Search for:

Search scope:

Type:

Search in:

Date range:

The last

Sort by:

Sign up for:

Oregon Industry Press

The daily local news briefing you can trust. Every day. Subscribe now.

By signing up, you agree to our Terms & Conditions.